The integrated system combines a REBLOC concrete vehicle restraint system with a StalCorp noise barrier in one certified structure. The guardrail element, 1.0 to 1.5 m high, carries the posts and panels directly, so no separate foundation, drainage or geological investigation is needed and the barrier occupies less space in the road cross-section. The system is tested and certified to both EN 14388 (noise barrier) and EN 1317 (vehicle restraint), with acoustic performance verified in the laboratory and in situ. Total system heights from 2.0 to 6.5 m. Standard StalCorp noise barrier elements – transparent, metallic, timber or photovoltaic – can be used, so the integrated system can meet acoustic or architectural requirements of any project. Installation is fast and possible in all weather conditions, without individual design for each site.
- Occupy less space within the road cross-section
- Eliminate part of installation costs (standard traffic barrier, drainage system, geological investigations)
- No need for individual design, reducing engineering costs
- Fast installation, possible in all weather conditions while ensuring quality
- Tested and certified according to EN 14388 and EN 1317
- Installed closer to the road, allowing reduced barrier height
- Acoustic performance determined in both laboratory and in-situ conditions: EN 1793-1 and EN 1793-2, EN 1793-5 and EN 1793-6
- Traffic barrier height from 1.0 to 1.5 m
- Total system height from 2.0 m to 6.5 m
- Possibility to use standard noise barrier elements – transparent, metallic, etc.
Documents